Capable Sites

All three macros export to a static site. Calendar mounts a working grid from a generated events file plus a downloadable .ics; Event renders an inline pill plus an .ics button; Clock ticks in the visitor's browser.


#Worth knowing

Static calendars carry at most 500 events and print "Only the first 500 events are included on static sites." when truncated. If the linked saved calendar cannot be read at build time the page prints "Linked calendar asset could not be loaded for this static export." An Event macro left on the default Time zone renders in UTC on a static site.


#Where you do it

Task

Where

Show the dates already on a page as a calendar

Page editor → insert "Calendar (Capable)" (Suite) or "Calendar macro (Capable)" (standalone)

Add a set of world clocks

Page editor → insert "Clock (Capable)" / "Clock macro (Capable)"

Add an inline event date to a page

Page editor → insert "Event (Capable)" / "Event macro (Capable)"


#Settings that affect this

Setting

Where

What it does

Calendar subscriptions

Confluence settings → Capable (Capable Calendar in the standalone app) → Features

"Let users subscribe to Capable calendars from Google, Apple, or Outlook via a personal iCal feed. Turn off to disable subscriptions for all users." Only appears when the installed app includes the Calendar capability. T

Calendar (global settings tab)

Confluence settings → Capable → Calendar

Card title "Calendar subscriptions", description "Personal iCal feed links your users have generated for calendars." Lists user, calendar, status and created date, paged with Previous/Next. Non-administrators see "Conflu

Calendar capability visibility

Space settings → Capable → capability list → Calendar

Auto shows the byline where relevant. In the Suite that means only on pages Capable has already indexed as carrying dates. Always forces Calendar on for the space; Never hides it there. This is the generic per-capability


#Limits that apply here

Limit

Value

What happens

Static site calendar export

-

Beyond that the exported page prints "Only the first 500 events are included on static sites."