PlantUML for Confluence (Avono/DC)

Capable recognises 3 macros from PlantUML for Confluence (Avono). 3 of them convert, and none are left behind.


#At a glance

Macro

Becomes

Support

PlantUML & Flowchart

Capable Diagram

Converted

Space Graph

Capable Space graph macro

Converted

Link Graph

Capable Link graph macro

Converted


#What each one does

#PlantUML & Flowchart

The same Confluence page after migration, with the Gantt chart and mind map rendered inside macros headed PlantUML Diagram followed by a short identifier.
The same drawings after the run, each one now a Capable diagram with its own identifier in the macro header.
Avono macros on a page before a migration, covering Gantt, mind map, network and work breakdown drawings.

Migrates to

Capable Diagram

Support

Converted

What survives the move

  • PlantUML and Flowchart diagram source

  • Version history at behaviour version 1.1.0 or higher

What does not come across

  • JCCKit, Math and LaTeX diagram types, which are left unchanged

  • Marked partial for exactly that reason: three of the vendor's diagram types are not converted.

#Space Graph

Migrates to

Capable Space graph macro

Support

Converted

Migrates to

Capable Link graph macro

Support

Converted

  • The source macro is inline and the Capable macro is a block, so the surrounding paragraph is split around it.



Find the drawing first. Everything else follows.